Shopping Center Handover Checklist

Blank transition file from pre-closing through the first 90 days. Louisiana labels are an example layer, not a property file.

PLATE · FIELD NOTE
Field note. Illustrative drawing.

Blank transition file from pre-closing through the first 90 days. Louisiana labels are an example layer, not a property file. Work the list below. Progress saves in this browser. Download the printable blank.

A blank transition file for a shopping center changing owners or managers. Fill every line. Do not mark an item complete without the artifact in hand: a document, a confirmation, an account credential, or a signed acknowledgment.

This is operator context for a blank you fill in. It is not legal, tax, or investment advice. Where a lease, a lender, or a statute decides the next step, the worksheet records the question and the document. Counsel answers it.

Items tagged [LA] are a Louisiana example. Items tagged [LFT] are a Lafayette Parish / Acadiana example. Replace that layer for another parish or state. No property name, tenant, or account belongs on the master blank — copy it per center.

Property identification

FieldEntry
Property Name
Street Address
City / Parish / State / ZIP
Owner Entity (Legal Name)
Owner EIN
Property Type
Gross Leasable Area (GLA)
Land Area (acres / sq ft)
Number of Buildings
Number of Suites / Demised Units
Tax Parcel ID(s)
Year Built / Year Renovated
Outgoing Owner / Manager
Incoming Owner / Manager
Effective Handover Date
Closing / Transfer Date

Phase tracker

SectionOwnerTarget dateStatus
Phase 1 — Pre-Closing Due Diligence
Phase 2 — Closing / Day-One Transition
Phase 3 — Property Management Handover
Phase 4 — Bookkeeping & Accounting Handover
Phase 5 — Legal File Handover
Phase 6 — Physical Plant & Building Systems
Phase 7 — Compliance & Regulatory (LA / Lafayette Parish)
Phase 8 — First 30 / 60 / 90 Day Action Items
Final Sign-Off & Acknowledgments

How to use this document

This checklist is organized in three time horizons: (1) Pre-Closing Due Diligence — what must be collected, reviewed, and verified before the deal closes; (2) Closing & Day-One Transition — what must be executed at or around the transfer date; (3) First 90 Days — operational handover, integration, and verification.

Each phase is broken into cross-cutting domains: Legal & Corporate, Title & Real Property, Leases & Tenants, Financial / Bookkeeping, Operations, Physical Plant, Insurance & Risk, Regulatory Compliance, Marketing, and Technology. Items marked with [LA] are Louisiana-specific. Items marked with [LFT] are Lafayette / Acadiana specific.

Every checkbox is intended to produce a deliverable: a document, a confirmation email, an account credential, or a signed acknowledgment. Do not mark complete without the artifact in hand.

Phase 1 — Pre-Closing Due Diligence

Target completion: before closing / contract effective date. Sellers / outgoing operators are typically obligated to deliver these under the PSA’s due diligence clause.

1.1 Entity & Corporate Documents

  • Articles of Organization / Incorporation for owner entity (certified copy)
  • Operating Agreement / Bylaws (current, fully executed, with all amendments)
  • Certificate of Good Standing from Secretary of State [LA: louisiana.gov/SOS]
  • EIN confirmation letter (IRS CP-575 or equivalent)
  • Federal tax returns — prior 3 years (Form 1065 / 1120 / 1040-Sch E)
  • State tax returns — prior 3 years
  • Authorized signer resolution / consent for sale or transfer
  • List of all members / shareholders with ownership percentages
  • Capital account ledger / member contribution history
  • Prior K-1s for all members (3 years)
  • Any side letters, buy-sell agreements, or transfer restrictions
  • UCC search on entity name (no liens against owner entity)
  • Litigation search — entity as plaintiff or defendant

1.2 Title, Survey & Real Property

  • Vesting deed (most recent recorded conveyance to current owner)
  • Chain of title — back 20+ years or to subdivision plat
  • Current title commitment / preliminary title report
  • Owner’s title insurance policy (existing)
  • All recorded exceptions to title — copies of each
  • ALTA / NSPS Land Title Survey (recent — within 12 months ideal)
  • Topographic survey if available
  • As-built site plan
  • Boundary survey with bearings / distances
  • Legal description (metes & bounds) — verify matches deed
  • Plat / subdivision map showing parcel(s)
  • Mineral rights status [LA: critical — minerals often severed from surface]
  • Servitudes of passage / utility servitudes [LA civil law term for easements]
  • Air rights / subsurface rights documentation if applicable

1.3 Loan, Mortgage & Lender Documents

  • All current notes (promissory notes) on the property
  • Mortgage / Deed of Trust / [LA: Act of Mortgage] for each loan
  • Loan agreement and any modifications / extensions
  • Most recent loan payoff statement (good for 30 days)
  • Current loan amortization schedule
  • Lender escrow analysis (tax, insurance, reserves)
  • Reserve account balances (replacement, TI/LC, debt service)
  • Lender estoppel / consent to transfer (if assumable loan)
  • Defeasance or prepayment penalty quote (if applicable)
  • UCC-1 filings by lender — review and prepare termination if paying off
  • Cross-collateralization documents (if loan covers other properties)
  • Loan covenants compliance certificates (DSCR, occupancy, etc.)
  • Lender-required reports (operating statements, rent rolls submitted)
  • Guaranty agreements and current status of guarantors

1.4 Easements, REAs, CC&Rs & Operating Covenants

REAs (Reciprocal Easement Agreements) and OEAs are the single most-overlooked risk area in shopping center transitions. Read every page.

  • Reciprocal Easement Agreement(s) — full executed copy with all amendments
  • Operating Easement Agreement (OEA) if separate from REA
  • Declaration of Covenants, Conditions & Restrictions (CC&Rs)
  • Cross-parking easements
  • Access / ingress-egress easements
  • Utility easements (water, sewer, gas, electric, telecom, drainage)
  • Stormwater / detention easements
  • Sign easements (pylon, monument, off-premise)
  • Anchor tenant operating covenants (continuous operation, hours, use)
  • Co-tenancy and dark-store clauses affecting property obligations
  • Common area maintenance obligations across multiple parcels
  • REA-mandated insurance requirements and current compliance
  • Approval rights — who must consent to leases, alterations, redevelopment
  • Right of first refusal (ROFR) / right of first offer (ROFO) holders
  • Schedule of all parties with REA approval rights

1.5 Zoning, Land Use & Entitlements

  • Current zoning classification — written verification
  • Zoning compliance letter / zoning verification letter
  • Permitted uses under current zoning
  • Variances, special exceptions, conditional use permits granted
  • Site plan approvals (original and amendments)
  • Setback, height, parking ratio, FAR requirements vs actual
  • Non-conforming use status (grandfathered uses)
  • Pending zoning changes that could affect property
  • Adjacent zoning and pending changes [LFT: check Lafayette Consolidated Government]
  • Comprehensive plan / future land use designation
  • Historic designation status (none expected for typical retail strip)
  • Tax Increment Financing (TIF) district participation
  • Economic development incentive agreements [LA: ITEP, RTA, Quality Jobs]

1.6 Environmental

  • Phase I Environmental Site Assessment (within 12 months for lender)
  • Phase II ESA if Phase I identified recognized environmental conditions
  • Historical use research (gas stations, dry cleaners, auto repair on site or adjacent)
  • Underground storage tank (UST) registration and status
  • Above-ground storage tank documentation
  • Asbestos-containing materials (ACM) survey [pre-1981 buildings]
  • Lead-based paint survey (commercial use exempt but tenants may trigger)
  • Mold remediation history
  • Radon testing results
  • Stormwater Pollution Prevention Plan (SWPPP) if construction-active
  • Spill Prevention Control and Countermeasures (SPCC) plan if applicable
  • Wetlands delineation [LA: heightened relevance given Acadiana hydrology]
  • FEMA flood zone designation and current Flood Insurance Rate Map (FIRM)
  • Elevation certificate(s) for each building
  • Letter of Map Amendment / Revision (LOMA / LOMR) if applicable
  • Hurricane / windstorm damage history and repair records [LA]

1.7 Engineering, Structural & ADA

  • Property Condition Assessment (PCA) / Property Condition Report
  • Structural engineer reports (any in last 5 years)
  • Roof inspection reports and remaining useful life estimates
  • HVAC inventory and condition assessment per unit
  • Parking lot condition assessment (pavement, striping, lighting)
  • Drainage / stormwater system condition
  • ADA Title III accessibility audit
  • ADA transition plan / remediation schedule
  • Fire suppression system inspection (sprinklers, hoods)
  • Backflow preventer test reports
  • Elevator inspection certificates (if applicable)
  • Generator load-bank test reports (if applicable)
  • Geotechnical / soils report (original construction)

1.8 Lease Files & Tenant Documentation

Per tenant. Build one file per suite. Cross-reference to rent roll and CAM reconciliation.

  • Original lease (fully executed)
  • All amendments, addenda, side letters in chronological order
  • Renewal / extension exercises (written notices and acknowledgments)
  • Letter of Intent (LOI) and original term sheet
  • Guaranty agreements (corporate and personal)
  • Guarantor financial statements and credit reports
  • Tenant financial statements (most recent available)
  • Tenant sales reports (if percentage rent or required reporting)
  • Estoppel certificate — current within 30 days of closing
  • Subordination, Non-Disturbance and Attornment Agreement (SNDA)
  • Memorandum of Lease (recorded, if any)
  • Tenant Improvement (TI) / Build-Out agreement and completion certificates
  • TI allowance reconciliation — amounts paid and remaining
  • Commencement Date Confirmation / Delivery Memo
  • Punch list and resolution documentation
  • Certificate of Occupancy for tenant space
  • Certificate of Insurance (COI) — current, with landlord as additional insured
  • Tenant W-9 (rare — typically reverse: landlord W-9 to tenant)
  • Security deposit ledger (amount, form, holding location)
  • Letter of Credit (if used as deposit) — original physical document and renewal status
  • Prepaid rent ledger
  • Default notices issued, cure status, and current standing
  • Co-tenancy clause inventory and compliance status
  • Exclusive use clause inventory (use restrictions binding other tenants)
  • Radius restriction inventory (tenant cannot operate within X miles)
  • Option to expand / contract / terminate inventory with trigger dates
  • Right of First Refusal / First Offer on adjacent space
  • Assignment / sublease history and consents
  • Tenant operating hours requirements
  • Signage rights documentation (pylon position, monument, façade)

1.9 Rent Roll & Financial History

  • Certified rent roll as of due diligence date
  • Aged delinquency report (current, 30, 60, 90+ days)
  • Trailing 12 months rent roll (month by month)
  • Historical occupancy — last 5 years monthly
  • Operating statements — last 3 fiscal years
  • Trailing 12 months operating statement (T-12)
  • Year-to-date operating statement
  • Trailing 3 months operating statement (T-3)
  • Annual budget — current year
  • Capital expenditure budget and history (5 years)
  • General Ledger — current year and prior year
  • Bank statements — last 12 months for all property accounts
  • Tenant ledger (statement of charges and payments) per tenant
  • List of one-time / non-recurring income and expenses

1.10 CAM, Tax & Insurance Reconciliations

CAM disputes are a common post-closing fight. Reconcile thoroughly.

  • CAM pool methodology documentation (gross-up, exclusions, caps)
  • Pro-rata share calculations per tenant
  • CAM reconciliations — last 3 years per tenant
  • Real estate tax reconciliations — last 3 years
  • Insurance pass-through reconciliations — last 3 years
  • Tenant CAM dispute log and resolution status
  • Outstanding CAM credits / billbacks to tenants
  • Administrative fee / management fee inclusion in CAM
  • Capital expenditures historically passed through (with tenant consent doc)
  • CAM cap / stop calculations per tenant
  • Audit rights exercised by tenants — copies and resolutions

1.11 Vendor & Service Contracts

  • Property management agreement (current)
  • Leasing agreement / commission schedule (current and unpaid commissions)
  • Landscaping / grounds maintenance contract
  • Janitorial / common area cleaning contract
  • Trash / waste removal contract
  • Pest control contract
  • HVAC service / preventive maintenance contract
  • Roof maintenance / inspection contract
  • Parking lot maintenance (striping, sealcoat, repairs)
  • Parking lot sweeping contract
  • Security service / patrol contract
  • Security camera / alarm monitoring contract
  • Fire alarm monitoring contract
  • Fire sprinkler inspection contract (annual / quarterly)
  • Fire extinguisher service contract
  • Backflow preventer testing contract
  • Elevator maintenance contract (if applicable)
  • Generator maintenance contract (if applicable)
  • Pylon / monument sign maintenance and electricity
  • Window cleaning contract (if applicable)
  • Snow removal — N/A in Acadiana but verify no legacy contracts
  • Utility accounts inventory (electric, gas, water/sewer, telecom)
  • Cable / internet contracts for management office or common areas
  • Software subscriptions (PM platform, accounting, CRM)
  • Vendor W-9s on file for all 1099-eligible vendors
  • Vendor COIs current — all with landlord as additional insured
  • Outstanding vendor invoices / aging payables
  • Vendor contract assignability review (which require consent)

1.12 Litigation, Disputes & Claims

  • Active litigation as plaintiff (collection actions, evictions)
  • Active litigation as defendant
  • Threatened claims or demand letters (last 24 months)
  • Insurance claims history (last 5 years) with loss runs
  • Workers’ compensation claims (if employees)
  • ADA complaints or DOJ investigations
  • Tenant disputes — log of unresolved issues
  • Mechanics liens / privileges [LA: Private Works Act privileges]
  • Notice of construction filings [LA: required for many projects]
  • Code enforcement notices / violations

1.13 Insurance Policies & Loss History

  • Commercial property policy declarations (current and prior 3 years)
  • Replacement cost / building valuation (RCV) appraisal
  • Commercial general liability policy
  • Umbrella / excess liability policy
  • Flood insurance policy [LA: critical, NFIP and/or private]
  • Windstorm / named peril coverage — verify hurricane deductible [LA]
  • Earthquake (low priority LA but verify)
  • Boiler & machinery / equipment breakdown
  • Business income / rental income loss
  • Ordinance or law coverage
  • Pollution legal liability (if environmental concerns)
  • Cyber liability (if collecting tenant data / online payments)
  • Crime / employee dishonesty / fidelity bond
  • D&O / EPLI if entity has board / employees
  • Loss runs — 5 years from each carrier
  • Claims status — open and closed
  • Pending / unrepaired insurance claim work
  • Certificate holder list (lenders, REA parties)

1.14 Permits, Licenses & Certificates

  • Certificate of Occupancy — shell and core
  • Certificate of Occupancy — each tenant suite
  • Building permits — last 10 years (open and closed)
  • Open / un-closed permits — must be resolved before closing
  • Fire marshal inspection certificates [LA: State Fire Marshal]
  • Health department permits (if food tenants) [LA: Dept of Health]
  • Alcoholic Beverage Outlet (ABO) permits [LA: ATC]
  • Sign permits
  • Occupational licenses [LFT: Lafayette Consolidated Government]
  • Sales tax registration [LA: state + parish/local separate registrations]
  • Stormwater discharge permit (if applicable)
  • Sprinkler / fire suppression certificates
  • Elevator operating permits
  • Generator air permits (if applicable)

Phase 2 — Closing & Day-One Transition

These items execute at, on, or within 5 business days of closing. Coordinate among seller, buyer, title company, and incoming property manager.

2.1 Prorations & Closing Statement

  • Rent prorations — current month, by tenant
  • Prepaid rent transfer to buyer
  • Real estate tax proration [LA: parish assessor cycle — verify]
  • Insurance proration / cancellation refund
  • CAM, tax, insurance reconciliations — final true-up at closing or 90 days post
  • Utility prorations and final meter readings
  • Vendor accruals — outstanding work / unbilled services
  • Management fee / leasing commissions accrual
  • Outstanding TI / LC obligations assumed by buyer
  • Lender escrow balance transfer or refund
  • Reserve account transfer

2.2 Security Deposits & Letters of Credit

  • Security deposit reconciliation per tenant
  • Cash deposit transfer to buyer’s account (or credit at closing)
  • LOC originals delivered to buyer
  • LOC amendments / new LOCs in buyer’s name (if required)
  • Buyer assumes obligation to account / refund per lease terms
  • Tenant notification of deposit transfer

2.3 Tenant Notification & Rent Direction

  • Joint tenant notification letter (seller + buyer) — signed and mailed
  • Rent direction letter — new payee, address, ACH info, payment portal
  • New W-9 for buyer entity delivered to all tenants
  • ACH change instructions for tenants on auto-pay
  • New COI requirements / additional insured update letter
  • Welcome packet to tenants from new owner / PM
  • Property manager introduction (name, phone, email, emergency line)

2.4 Estoppels & SNDAs

  • Estoppel certificate from each tenant — dated within 30 days of closing
  • Discrepancies between estoppel and lease — resolved or carved out
  • Anchor tenant estoppels — extra scrutiny on co-tenancy / continuous op
  • REA party estoppels (if required)
  • SNDAs from lender to tenants (if new financing)
  • Subordination requirements re-confirmed

2.5 Insurance Transfer

  • New owner insurance bound effective at closing — binder delivered
  • Lender named as mortgagee / loss payee on new policy
  • REA-required certificate holders added
  • Tenant additional-insured status preserved or replaced
  • Existing policy cancellation effective at closing
  • Pending claims — clarified who controls (typically seller)
  • Tail coverage / extended reporting period (if required)

2.6 Banking & Cash Management

  • Operating bank account opened in buyer entity name
  • Security deposit trust account opened (separate from operating) [LA: best practice]
  • Reserve account opened (replacement reserves, TI/LC)
  • Bank signatories filed (managing member, PM, controller as applicable)
  • Wire and ACH instructions documented and distributed internally
  • Lockbox / PO box established for rent receipts (if used)
  • Online banking access provisioned to PM, bookkeeper, owner
  • Positive pay / fraud controls enabled
  • Tenant payment portal configured (DoorLoop, AppFolio, or equivalent)
  • Credit card processing / merchant account established

2.7 Vendor Assignment & Notification

  • Service contracts assigned (consents obtained where required)
  • Vendors notified of ownership change in writing
  • New billing addresses provided to each vendor
  • New W-9 from buyer to vendors who owe 1099 reporting
  • Replacement vendors selected where seller relationship not transferable
  • Emergency vendor list distributed (24/7 plumbing, electrical, roof, glass, locksmith)

2.8 Keys, Access Codes, Locks

  • Master key inventory — physical handover
  • Sub-master / submaster keys per building / area
  • Suite keys (where landlord retains spares per lease)
  • Mechanical / electrical / roof / janitorial closet keys
  • Alarm codes — main and per suite
  • Gate / dumpster enclosure codes
  • Management office locks rekeyed at closing
  • Common area door / restroom keys
  • Roof access keys / hatch codes
  • Sign / monument access keys
  • Key log with chain of custody
  • Decision: rekey master after closing (recommended)

2.9 Utility Transfer

  • Electric — common areas, parking lot lighting, signage [LFT: LUS or SLEMCO]
  • Natural gas (if applicable)
  • Water / sewer — landlord meters [LFT: Lafayette Utilities System]
  • Trash service (if landlord-paid)
  • Telecom / internet for management office
  • Irrigation water (if separate meter)
  • Final meter readings recorded
  • Deposit refunds requested where applicable
  • New accounts opened in buyer entity name
  • Autopay configured

2.10 Mail, Address & Public-Facing Items

  • USPS mail forwarding from prior owner address (if different)
  • Property mailing address confirmed (suite for management office)
  • Registered agent updated [LA: Sec of State filing]
  • Property website / domain transferred or redirected
  • Google Business Profile claimed / transferred
  • Social media account access transferred or new accounts created
  • On-site signage updated (management contact, leasing inquiries)

Phase 3 — Property Management Handover

Operational continuity. Most failures here are documentation gaps, not bad faith. Insist on written SOPs and verified contact lists.

3.1 Tenant Directory & Contacts

  • Full tenant contact list — primary, secondary, after-hours, emergency
  • Tenant corporate / regional contacts (for national chains)
  • Tenant accounting AP contacts (for rent / CAM billing)
  • Tenant facilities contacts (for service requests)
  • Tenant insurance broker / agent contacts
  • Tenant legal counsel (where known)
  • Co-tenancy / anchor tenant special escalation paths

3.2 Emergency Procedures

  • 24/7 emergency contact line established
  • Emergency response SOP (water leak, fire, electrical, gas, sewer backup)
  • Hurricane / severe weather SOP [LA: critical — pre-season checklist]
  • Tornado / wind event protocol
  • Active shooter / security incident protocol
  • Power outage protocol — sequence of restoration calls
  • Tenant evacuation / shelter-in-place plans
  • Emergency vendor list with after-hours numbers verified
  • Local first responder contacts [LFT: LPD, LFD, LPSO, EMS]
  • Property manager on-call rotation

3.3 Property Management Software

  • Platform selected / continued (DoorLoop, AppFolio, Yardi, MRI, etc.)
  • Subscription transferred or new account provisioned
  • Historical data migration completed and verified
  • Rent roll matches accounting system
  • Tenant ledgers reconciled
  • Vendor records imported
  • Property profile, units, square footage configured
  • Lease abstracts entered (all critical dates, options, escalations)
  • Automated rent statements / invoices configured
  • Late fee rules configured per lease
  • Tenant portal access provisioned and welcome emails sent
  • Owner portal access for ownership reporting
  • User roles / permissions configured (PM, accounting, owner, leasing)

3.4 Maintenance Schedules

  • HVAC PM schedule by unit (quarterly filter changes, semi-annual service)
  • Roof inspection schedule (semi-annual, after major storms)
  • Gutter / drain cleaning schedule
  • Parking lot striping schedule (typically 2-3 years)
  • Parking lot sealcoating schedule (typically 3-5 years)
  • Parking lot light pole inspection and lamp replacement
  • Pylon / monument sign light replacement schedule
  • Fire sprinkler inspection (quarterly, annual, 5-year per NFPA 25)
  • Fire alarm inspection (annual)
  • Fire extinguisher service (annual, 6-year, 12-year hydrostatic)
  • Backflow preventer test (annual per local water authority)
  • Hood / grease trap cleaning (food tenants — verify tenant or landlord responsibility)
  • Pest control treatment schedule
  • Landscape mowing / mulch / seasonal schedule
  • Pressure washing schedule (sidewalks, parking lot, dumpster areas)
  • Window cleaning schedule (if applicable)

3.5 Leasing Pipeline & Marketing

  • Active LOIs in progress — status and next steps
  • Drafted leases pending execution
  • Prospect pipeline log (CRM / spreadsheet)
  • Broker relationships and current listing agreements
  • Listing on LoopNet, CoStar, Crexi, etc. — transfer or relist
  • Property marketing brochure / flyer (editable source files)
  • Site plan / availability plan (editable)
  • Photos (interior, exterior, drone) — high-res, transferable license
  • Demographic / trade area study (current within 2 years)
  • Co-tenancy / use restriction matrix for leasing reference
  • Standard form lease (most recent version with attorney review date)

3.6 Operating Procedures & Policies

  • Rent collection policy (grace period, late fees, NSF fees)
  • Default / cure / eviction SOP [LA: civil law process via Justice of the Peace or City Court]
  • Service request intake and dispatch SOP
  • Vendor onboarding requirements (W-9, COI, MSA)
  • Approval matrix (PM authority, owner approval thresholds)
  • Capital expenditure approval workflow
  • Lease execution authority and signing protocols
  • Tenant relations / complaint resolution SOP
  • Rules and Regulations document (typically attached to lease)
  • Document retention policy

Phase 4 — Bookkeeping & Accounting Handover

Where deals go to die. Push for full reconciliations through closing date and a single source of truth for the GL on transfer.

4.1 Chart of Accounts & GL

  • Chart of accounts adopted (or migrated and mapped from seller)
  • Property-level class / location / department coding
  • Trial balance as of closing date — reviewed and accepted
  • Opening balance sheet — buyer entity
  • Closing balance sheet — seller entity
  • GL system selected (QuickBooks Online, Sage Intacct, etc.)
  • Integration with PM platform configured (rent roll → GL sync)

4.2 Accounts Receivable

  • AR aging at closing — by tenant
  • Disputed / contested charges identified and flagged
  • Pre-closing AR retained by seller or sold/assigned to buyer (per PSA)
  • Collection actions in progress and post-closing responsibility
  • Write-off policy for uncollectible accounts
  • Bad debt reserve methodology

4.3 Accounts Payable

  • AP aging at closing — by vendor
  • Unbilled work / accrued services identified
  • Pre-closing AP retained by seller (typical) — list documented
  • Stop-payment / wind-down on seller AP
  • Mechanics liens / privileges potential — lien waivers from active contractors [LA: Private Works Act]
  • Outstanding commission obligations to brokers

4.4 CAM Reconciliation Status

  • Most recent prior-year CAM reconciliation completed and delivered to tenants
  • Current year CAM estimates (monthly billing) reviewed
  • Mid-year reconciliation for closing prorations
  • Tenant CAM credits owed — list and amounts
  • Tenant CAM billbacks owed — list and amounts
  • CAM caps / stops tracking documented
  • Methodology documentation transferred (gross-up, exclusions)

4.5 Tax Calendar & Filings

  • Federal income tax filing deadlines and preparer identified
  • Louisiana corporate / partnership tax deadlines [LA: LDR]
  • Quarterly estimated tax payments scheduled
  • Sales/use tax filing — landlord rare but required if any direct retail [LA: parish + state]
  • Personal property / business tangible tax [LFT: Lafayette Parish Assessor LAT-5]
  • Real estate tax payment cycle [LFT: Lafayette Parish Sheriff’s Office / Assessor]
  • Real estate tax appeal status / deadlines
  • Annual report filing [LA: Sec of State, due each anniversary]
  • Occupational license renewal [LFT: LCG, typically annual]
  • 1099 filing process for vendors (Jan 31 deadline)

4.6 Reporting Cadence

  • Monthly owner package contents defined (P&L, BS, rent roll, variance, AR aging)
  • Quarterly reporting requirements (lender, investors)
  • Annual budget process timeline
  • Annual audit / review / compilation — preparer and timeline
  • Lender-required reporting (covenant compliance, T-12, rent roll)
  • Investor reporting if syndicated

4.7 Software Access

  • Accounting platform — admin credentials
  • Bank portal access for AP / treasury function
  • Bill.com or equivalent AP platform
  • Payroll platform if any employees
  • Tax preparation software / portal
  • Document management / secure file share

5.1 Counsel Relationships

  • Outgoing counsel introduction call / file transfer letter
  • Incoming counsel engagement letter executed
  • Conflict check completed
  • Confidential files transferred under joint engagement / waiver letter
  • Active matter status memo from outgoing counsel
  • Eviction / collection actions — court, docket, status, next hearing
  • Tenant disputes / arbitrations — status, position memos
  • REA disputes — status and party positions
  • Insurance claims under counsel
  • Code enforcement matters
  • Mechanics lien / privilege defenses [LA: Private Works Act timelines — confirm with counsel]

This is a list of templates to collect from counsel. A file name is not permission to send the notice. Which form is valid, and when, is counsel’s call.

  • Standard form lease (current attorney-approved version)
  • LOI template
  • Lease amendment template
  • Estoppel template
  • SNDA template
  • Guaranty template
  • Default notice templates counsel has approved for this state (the day-count is not in the file name)
  • Vendor MSA template
  • NDA template
  • Demand letter templates

5.4 Corporate Governance Calendar

  • Annual member / shareholder meeting
  • Annual report filing date [LA: SOS]
  • Registered agent renewal
  • Operating agreement review cycle
  • Board / member resolutions log

Phase 6 — Physical Plant & Building Systems Inventory

One-time inventory at handover with photo documentation. Becomes baseline for future PCAs and insurance claims.

6.1 Site & Exterior

  • Site plan / parking layout with stall count
  • ADA parking stalls count and signage compliance
  • Parking lot lighting inventory (poles, fixtures, controls, photocells)
  • Bollards, wheel stops, curbing inventory and condition
  • Landscape inventory (trees, beds, irrigation zones)
  • Irrigation controller location and zone map
  • Stormwater inlets / detention basin location and condition
  • Dumpster enclosures (number, condition, capacity)
  • Loading dock / service area inventory
  • Exterior building photographs — all elevations
  • Pylon sign — height, structure, electrical, tenant panels inventory
  • Monument signs — same as above
  • Directional / wayfinding signage inventory

6.2 Roof Systems

  • Roof type per building (TPO, EPDM, modified bitumen, metal, etc.)
  • Roof age and remaining warranty per building
  • Roof warranty documents (NDL, manufacturer, contractor)
  • Roof inspection reports (last 24 months)
  • Penetration inventory (HVAC curbs, vents, drains, skylights)
  • Roof access points and safety equipment
  • Drainage system (internal drains, scuppers, downspouts)

6.3 HVAC / Mechanical

  • RTU inventory per suite (manufacturer, model, serial, tonnage, age)
  • Split system inventory (if applicable)
  • Tenant vs landlord HVAC responsibility per lease — matrix
  • Thermostat / BMS access
  • Refrigerant type per unit (R-22 phase-out implications)
  • PM service records last 24 months
  • Make-up air / exhaust systems (food tenants)

6.4 Electrical

  • Service entrance location and capacity per building
  • Meter base inventory (utility meters per tenant + landlord)
  • Main distribution panel locations
  • Subpanel locations per tenant
  • Site lighting panel(s) and controls
  • Emergency / exit lighting inventory
  • Generator (if any) — size, fuel, transfer switch
  • Solar / on-site generation (none expected but verify)

6.5 Plumbing

  • Water service entrance and meter inventory
  • Backflow preventer inventory and test history
  • Domestic hot water heaters (landlord vs tenant)
  • Common area restroom fixtures and condition
  • Grease trap / interceptor inventory (food tenants)
  • Sewer cleanout locations
  • Irrigation backflow / RPZ

6.6 Fire & Life Safety

  • Sprinkler system type per building (wet, dry, pre-action)
  • Fire pump (if applicable) — service records
  • FDC (Fire Department Connection) inventory and access
  • Fire alarm panel — make, model, age, monitoring company
  • Pull stations, horn-strobes, smoke / heat detector inventory
  • Fire extinguisher inventory (location, type, last service)
  • Kitchen hood / Ansul systems (food tenants)
  • Knox box location and key inventory [verify with LFD]
  • Emergency exit signage inventory

6.7 Security / IT

  • CCTV camera inventory and DVR/NVR access
  • Access control / card reader inventory
  • Alarm system zones and account info
  • Common area Wi-Fi (if provided)
  • Management office network / phones

Phase 7 — Compliance & Regulatory (Louisiana / Lafayette Parish)

Louisiana is a civil law jurisdiction — terminology and procedure differ from common-law states. Verify everything with LA-licensed counsel.

7.1 State of Louisiana

  • Secretary of State annual report — filing date and status
  • Registered agent of record — verified
  • LA Department of Revenue — entity tax registration
  • Sales and use tax registration (if collecting any direct sales tax)
  • Workers’ compensation coverage [LA: required for any employees]
  • Louisiana Workforce Commission registration (if employees)
  • State Fire Marshal annual inspection records
  • Louisiana Office of Alcohol and Tobacco Control — landlord disclosures for ABO tenants
  • LA Real Estate Commission — broker / PM licensing if managing for others
  • Notarial / authentic act recording verification for major property documents [LA civil law specifics]

7.2 Lafayette Parish / Lafayette Consolidated Government

  • Occupational license — owner entity
  • Occupational license verification — each tenant
  • Lafayette Parish Assessor — real property records up to date
  • Personal property declaration (LAT-5) filed
  • Lafayette Parish Sheriff’s Office — property tax payment status
  • Lafayette Consolidated Government — building / zoning compliance
  • Lafayette Utilities System (LUS) account status
  • Lafayette Fire Department — pre-plan / Knox box on file
  • Lafayette Police Department / LPSO — patrol coordination
  • Lafayette Parish Health Unit — food establishment permits per tenant

7.3 Federal

  • EIN current and entity classification confirmed
  • FinCEN beneficial ownership (BOI): entities formed in the U.S. are exempt (interim final rule March 26, 2025; final rule effective Aug 14, 2026). Only foreign entities registered to do business in a U.S. state still report. Confirm the entity’s status with counsel or the CPA.
  • Form 1099 filings for prior year (vendor 1099-NEC, rent 1099-MISC for any landlord status)
  • ADA Title III compliance documentation
  • OSHA compliance (if any landlord employees on site)
  • FEMA flood compliance and current flood insurance per lender

Phase 8 — First 30 / 60 / 90 Day Action Items

8.1 Days 1–30

  • Property walk with outgoing PM — full property tour, every suite exterior
  • Introductory in-person meeting with each tenant (or call for absent operators)
  • Confirm rent received from each tenant in new account
  • Verify ACH / payment portal working for each auto-pay tenant
  • Confirm utility transfers complete with no service interruption
  • Validate insurance binder converted to full policy with all endorsements
  • Validate lender escrow / reserve transfers reconciled
  • Vendor confirmation calls — service continuing without disruption
  • Emergency contact line tested
  • After-hours response drill (water leak / lockout simulation)
  • Photograph every suite exterior and common area for baseline
  • Hurricane season readiness check [LA: June 1 – Nov 30]

8.2 Days 31–60

  • First full monthly close in new GL — review with bookkeeper
  • First monthly owner package delivered
  • CAM billing reviewed for first month under new ownership
  • Tenant satisfaction survey or check-in calls
  • Service request volume and response time baseline established
  • Vendor performance review — confirm or replace
  • Active LOI / lease progression
  • Marketing materials updated with new ownership / PM contact
  • Website / listing platforms refreshed
  • Roof and HVAC PM scheduled in calendar

8.3 Days 61–90

  • CAM reconciliation methodology validated through closing-period reconciliation
  • Post-closing prorations true-up with seller (typical 90-day deadline)
  • Annual budget review and updates for new ownership assumptions
  • Capital plan reviewed (roof, parking, HVAC replacement schedule)
  • Lease abstracts spot-audited against source documents
  • Tenant COIs audited — all current, additional insured correct
  • Vendor COIs audited — all current
  • Insurance review with broker — coverage gaps, claims trends, premium opportunities
  • Property tax appeal consideration before deadline [LFT: Aug-Sep timeframe typical]
  • First quarterly lender reporting (if applicable) delivered on time
  • 90-day acknowledgment — sign-off page in this document

Sign-off and acknowledgments

Phase completion sign-offs. Acknowledgment means the artifacts referenced in each section are in hand, reconciled, and accepted.

PhaseOwnerProperty managerDate
Phase 1 — Due Diligence
Phase 2 — Closing / Day-One
Phase 3 — PM Handover
Phase 4 — Accounting Handover
Phase 5 — Legal Handover
Phase 6 — Physical Plant
Phase 7 — Compliance
Phase 8 — 90-Day Confirmation

Counsel review acknowledgment: this checklist is a working framework, not legal advice. Final adequacy for any specific transaction must be reviewed by Louisiana-licensed counsel and a qualified CPA familiar with commercial real estate.