# Shopping Center Handover Checklist

A blank transition file for a shopping center changing owners or managers. Fill every line. Do not mark an item complete without the artifact in hand: a document, a confirmation, an account credential, or a signed acknowledgment.

This is operator context for a blank you fill in. It is not legal, tax, or investment advice. Where a lease, a lender, or a statute decides the next step, the worksheet records the question and the document. Counsel answers it.


Items tagged **[LA]** are a Louisiana example. Items tagged **[LFT]** are a Lafayette Parish / Acadiana example. Replace that layer for another parish or state. No property name, tenant, or account belongs on the master blank — copy it per center.

## Property identification

| Field | Entry |
|---|---|
| Property Name | |
| Street Address | |
| City / Parish / State / ZIP | |
| Owner Entity (Legal Name) | |
| Owner EIN | |
| Property Type | |
| Gross Leasable Area (GLA) | |
| Land Area (acres / sq ft) | |
| Number of Buildings | |
| Number of Suites / Demised Units | |
| Tax Parcel ID(s) | |
| Year Built / Year Renovated | |
| Outgoing Owner / Manager | |
| Incoming Owner / Manager | |
| Effective Handover Date | |
| Closing / Transfer Date | |

## Phase tracker

| Section | Owner | Target date | Status |
|---|---|---|---|
| Phase 1 — Pre-Closing Due Diligence | | | |
| Phase 2 — Closing / Day-One Transition | | | |
| Phase 3 — Property Management Handover | | | |
| Phase 4 — Bookkeeping & Accounting Handover | | | |
| Phase 5 — Legal File Handover | | | |
| Phase 6 — Physical Plant & Building Systems | | | |
| Phase 7 — Compliance & Regulatory (LA / Lafayette Parish) | | | |
| Phase 8 — First 30 / 60 / 90 Day Action Items | | | |
| Final Sign-Off & Acknowledgments | | | |

## How to use this document

This checklist is organized in three time horizons: (1) Pre-Closing Due Diligence — what must be collected, reviewed, and verified before the deal closes; (2) Closing & Day-One Transition — what must be executed at or around the transfer date; (3) First 90 Days — operational handover, integration, and verification.

Each phase is broken into cross-cutting domains: Legal & Corporate, Title & Real Property, Leases & Tenants, Financial / Bookkeeping, Operations, Physical Plant, Insurance & Risk, Regulatory Compliance, Marketing, and Technology. Items marked with [LA] are Louisiana-specific. Items marked with [LFT] are Lafayette / Acadiana specific.

Every checkbox is intended to produce a deliverable: a document, a confirmation email, an account credential, or a signed acknowledgment. Do not mark complete without the artifact in hand.

## Phase 1 — Pre-Closing Due Diligence

Target completion: before closing / contract effective date. Sellers / outgoing operators are typically obligated to deliver these under the PSA's due diligence clause.

### 1.1 Entity & Corporate Documents

- [ ] Articles of Organization / Incorporation for owner entity (certified copy)
- [ ] Operating Agreement / Bylaws (current, fully executed, with all amendments)
- [ ] Certificate of Good Standing from Secretary of State [LA: louisiana.gov/SOS]
- [ ] EIN confirmation letter (IRS CP-575 or equivalent)
- [ ] Federal tax returns — prior 3 years (Form 1065 / 1120 / 1040-Sch E)
- [ ] State tax returns — prior 3 years
- [ ] Authorized signer resolution / consent for sale or transfer
- [ ] List of all members / shareholders with ownership percentages
- [ ] Capital account ledger / member contribution history
- [ ] Prior K-1s for all members (3 years)
- [ ] Any side letters, buy-sell agreements, or transfer restrictions
- [ ] UCC search on entity name (no liens against owner entity)
- [ ] Litigation search — entity as plaintiff or defendant

### 1.2 Title, Survey & Real Property

- [ ] Vesting deed (most recent recorded conveyance to current owner)
- [ ] Chain of title — back 20+ years or to subdivision plat
- [ ] Current title commitment / preliminary title report
- [ ] Owner's title insurance policy (existing)
- [ ] All recorded exceptions to title — copies of each
- [ ] ALTA / NSPS Land Title Survey (recent — within 12 months ideal)
- [ ] Topographic survey if available
- [ ] As-built site plan
- [ ] Boundary survey with bearings / distances
- [ ] Legal description (metes & bounds) — verify matches deed
- [ ] Plat / subdivision map showing parcel(s)
- [ ] Mineral rights status [LA: critical — minerals often severed from surface]
- [ ] Servitudes of passage / utility servitudes [LA civil law term for easements]
- [ ] Air rights / subsurface rights documentation if applicable

### 1.3 Loan, Mortgage & Lender Documents

- [ ] All current notes (promissory notes) on the property
- [ ] Mortgage / Deed of Trust / [LA: Act of Mortgage] for each loan
- [ ] Loan agreement and any modifications / extensions
- [ ] Most recent loan payoff statement (good for 30 days)
- [ ] Current loan amortization schedule
- [ ] Lender escrow analysis (tax, insurance, reserves)
- [ ] Reserve account balances (replacement, TI/LC, debt service)
- [ ] Lender estoppel / consent to transfer (if assumable loan)
- [ ] Defeasance or prepayment penalty quote (if applicable)
- [ ] UCC-1 filings by lender — review and prepare termination if paying off
- [ ] Cross-collateralization documents (if loan covers other properties)
- [ ] Loan covenants compliance certificates (DSCR, occupancy, etc.)
- [ ] Lender-required reports (operating statements, rent rolls submitted)
- [ ] Guaranty agreements and current status of guarantors

### 1.4 Easements, REAs, CC&Rs & Operating Covenants

REAs (Reciprocal Easement Agreements) and OEAs are the single most-overlooked risk area in shopping center transitions. Read every page.

- [ ] Reciprocal Easement Agreement(s) — full executed copy with all amendments
- [ ] Operating Easement Agreement (OEA) if separate from REA
- [ ] Declaration of Covenants, Conditions & Restrictions (CC&Rs)
- [ ] Cross-parking easements
- [ ] Access / ingress-egress easements
- [ ] Utility easements (water, sewer, gas, electric, telecom, drainage)
- [ ] Stormwater / detention easements
- [ ] Sign easements (pylon, monument, off-premise)
- [ ] Anchor tenant operating covenants (continuous operation, hours, use)
- [ ] Co-tenancy and dark-store clauses affecting property obligations
- [ ] Common area maintenance obligations across multiple parcels
- [ ] REA-mandated insurance requirements and current compliance
- [ ] Approval rights — who must consent to leases, alterations, redevelopment
- [ ] Right of first refusal (ROFR) / right of first offer (ROFO) holders
- [ ] Schedule of all parties with REA approval rights

### 1.5 Zoning, Land Use & Entitlements

- [ ] Current zoning classification — written verification
- [ ] Zoning compliance letter / zoning verification letter
- [ ] Permitted uses under current zoning
- [ ] Variances, special exceptions, conditional use permits granted
- [ ] Site plan approvals (original and amendments)
- [ ] Setback, height, parking ratio, FAR requirements vs actual
- [ ] Non-conforming use status (grandfathered uses)
- [ ] Pending zoning changes that could affect property
- [ ] Adjacent zoning and pending changes [LFT: check Lafayette Consolidated Government]
- [ ] Comprehensive plan / future land use designation
- [ ] Historic designation status (none expected for typical retail strip)
- [ ] Tax Increment Financing (TIF) district participation
- [ ] Economic development incentive agreements [LA: ITEP, RTA, Quality Jobs]

### 1.6 Environmental

- [ ] Phase I Environmental Site Assessment (within 12 months for lender)
- [ ] Phase II ESA if Phase I identified recognized environmental conditions
- [ ] Historical use research (gas stations, dry cleaners, auto repair on site or adjacent)
- [ ] Underground storage tank (UST) registration and status
- [ ] Above-ground storage tank documentation
- [ ] Asbestos-containing materials (ACM) survey [pre-1981 buildings]
- [ ] Lead-based paint survey (commercial use exempt but tenants may trigger)
- [ ] Mold remediation history
- [ ] Radon testing results
- [ ] Stormwater Pollution Prevention Plan (SWPPP) if construction-active
- [ ] Spill Prevention Control and Countermeasures (SPCC) plan if applicable
- [ ] Wetlands delineation [LA: heightened relevance given Acadiana hydrology]
- [ ] FEMA flood zone designation and current Flood Insurance Rate Map (FIRM)
- [ ] Elevation certificate(s) for each building
- [ ] Letter of Map Amendment / Revision (LOMA / LOMR) if applicable
- [ ] Hurricane / windstorm damage history and repair records [LA]

### 1.7 Engineering, Structural & ADA

- [ ] Property Condition Assessment (PCA) / Property Condition Report
- [ ] Structural engineer reports (any in last 5 years)
- [ ] Roof inspection reports and remaining useful life estimates
- [ ] HVAC inventory and condition assessment per unit
- [ ] Parking lot condition assessment (pavement, striping, lighting)
- [ ] Drainage / stormwater system condition
- [ ] ADA Title III accessibility audit
- [ ] ADA transition plan / remediation schedule
- [ ] Fire suppression system inspection (sprinklers, hoods)
- [ ] Backflow preventer test reports
- [ ] Elevator inspection certificates (if applicable)
- [ ] Generator load-bank test reports (if applicable)
- [ ] Geotechnical / soils report (original construction)

### 1.8 Lease Files & Tenant Documentation

Per tenant. Build one file per suite. Cross-reference to rent roll and CAM reconciliation.

- [ ] Original lease (fully executed)
- [ ] All amendments, addenda, side letters in chronological order
- [ ] Renewal / extension exercises (written notices and acknowledgments)
- [ ] Letter of Intent (LOI) and original term sheet
- [ ] Guaranty agreements (corporate and personal)
- [ ] Guarantor financial statements and credit reports
- [ ] Tenant financial statements (most recent available)
- [ ] Tenant sales reports (if percentage rent or required reporting)
- [ ] Estoppel certificate — current within 30 days of closing
- [ ] Subordination, Non-Disturbance and Attornment Agreement (SNDA)
- [ ] Memorandum of Lease (recorded, if any)
- [ ] Tenant Improvement (TI) / Build-Out agreement and completion certificates
- [ ] TI allowance reconciliation — amounts paid and remaining
- [ ] Commencement Date Confirmation / Delivery Memo
- [ ] Punch list and resolution documentation
- [ ] Certificate of Occupancy for tenant space
- [ ] Certificate of Insurance (COI) — current, with landlord as additional insured
- [ ] Tenant W-9 (rare — typically reverse: landlord W-9 to tenant)
- [ ] Security deposit ledger (amount, form, holding location)
- [ ] Letter of Credit (if used as deposit) — original physical document and renewal status
- [ ] Prepaid rent ledger
- [ ] Default notices issued, cure status, and current standing
- [ ] Co-tenancy clause inventory and compliance status
- [ ] Exclusive use clause inventory (use restrictions binding other tenants)
- [ ] Radius restriction inventory (tenant cannot operate within X miles)
- [ ] Option to expand / contract / terminate inventory with trigger dates
- [ ] Right of First Refusal / First Offer on adjacent space
- [ ] Assignment / sublease history and consents
- [ ] Tenant operating hours requirements
- [ ] Signage rights documentation (pylon position, monument, façade)

### 1.9 Rent Roll & Financial History

- [ ] Certified rent roll as of due diligence date
- [ ] Aged delinquency report (current, 30, 60, 90+ days)
- [ ] Trailing 12 months rent roll (month by month)
- [ ] Historical occupancy — last 5 years monthly
- [ ] Operating statements — last 3 fiscal years
- [ ] Trailing 12 months operating statement (T-12)
- [ ] Year-to-date operating statement
- [ ] Trailing 3 months operating statement (T-3)
- [ ] Annual budget — current year
- [ ] Capital expenditure budget and history (5 years)
- [ ] General Ledger — current year and prior year
- [ ] Bank statements — last 12 months for all property accounts
- [ ] Tenant ledger (statement of charges and payments) per tenant
- [ ] List of one-time / non-recurring income and expenses

### 1.10 CAM, Tax & Insurance Reconciliations

CAM disputes are a common post-closing fight. Reconcile thoroughly.

- [ ] CAM pool methodology documentation (gross-up, exclusions, caps)
- [ ] Pro-rata share calculations per tenant
- [ ] CAM reconciliations — last 3 years per tenant
- [ ] Real estate tax reconciliations — last 3 years
- [ ] Insurance pass-through reconciliations — last 3 years
- [ ] Tenant CAM dispute log and resolution status
- [ ] Outstanding CAM credits / billbacks to tenants
- [ ] Administrative fee / management fee inclusion in CAM
- [ ] Capital expenditures historically passed through (with tenant consent doc)
- [ ] CAM cap / stop calculations per tenant
- [ ] Audit rights exercised by tenants — copies and resolutions

### 1.11 Vendor & Service Contracts

- [ ] Property management agreement (current)
- [ ] Leasing agreement / commission schedule (current and unpaid commissions)
- [ ] Landscaping / grounds maintenance contract
- [ ] Janitorial / common area cleaning contract
- [ ] Trash / waste removal contract
- [ ] Pest control contract
- [ ] HVAC service / preventive maintenance contract
- [ ] Roof maintenance / inspection contract
- [ ] Parking lot maintenance (striping, sealcoat, repairs)
- [ ] Parking lot sweeping contract
- [ ] Security service / patrol contract
- [ ] Security camera / alarm monitoring contract
- [ ] Fire alarm monitoring contract
- [ ] Fire sprinkler inspection contract (annual / quarterly)
- [ ] Fire extinguisher service contract
- [ ] Backflow preventer testing contract
- [ ] Elevator maintenance contract (if applicable)
- [ ] Generator maintenance contract (if applicable)
- [ ] Pylon / monument sign maintenance and electricity
- [ ] Window cleaning contract (if applicable)
- [ ] Snow removal — N/A in Acadiana but verify no legacy contracts
- [ ] Utility accounts inventory (electric, gas, water/sewer, telecom)
- [ ] Cable / internet contracts for management office or common areas
- [ ] Software subscriptions (PM platform, accounting, CRM)
- [ ] Vendor W-9s on file for all 1099-eligible vendors
- [ ] Vendor COIs current — all with landlord as additional insured
- [ ] Outstanding vendor invoices / aging payables
- [ ] Vendor contract assignability review (which require consent)

### 1.12 Litigation, Disputes & Claims

- [ ] Active litigation as plaintiff (collection actions, evictions)
- [ ] Active litigation as defendant
- [ ] Threatened claims or demand letters (last 24 months)
- [ ] Insurance claims history (last 5 years) with loss runs
- [ ] Workers' compensation claims (if employees)
- [ ] ADA complaints or DOJ investigations
- [ ] Tenant disputes — log of unresolved issues
- [ ] Mechanics liens / privileges [LA: Private Works Act privileges]
- [ ] Notice of construction filings [LA: required for many projects]
- [ ] Code enforcement notices / violations

### 1.13 Insurance Policies & Loss History

- [ ] Commercial property policy declarations (current and prior 3 years)
- [ ] Replacement cost / building valuation (RCV) appraisal
- [ ] Commercial general liability policy
- [ ] Umbrella / excess liability policy
- [ ] Flood insurance policy [LA: critical, NFIP and/or private]
- [ ] Windstorm / named peril coverage — verify hurricane deductible [LA]
- [ ] Earthquake (low priority LA but verify)
- [ ] Boiler & machinery / equipment breakdown
- [ ] Business income / rental income loss
- [ ] Ordinance or law coverage
- [ ] Pollution legal liability (if environmental concerns)
- [ ] Cyber liability (if collecting tenant data / online payments)
- [ ] Crime / employee dishonesty / fidelity bond
- [ ] D&O / EPLI if entity has board / employees
- [ ] Loss runs — 5 years from each carrier
- [ ] Claims status — open and closed
- [ ] Pending / unrepaired insurance claim work
- [ ] Certificate holder list (lenders, REA parties)

### 1.14 Permits, Licenses & Certificates

- [ ] Certificate of Occupancy — shell and core
- [ ] Certificate of Occupancy — each tenant suite
- [ ] Building permits — last 10 years (open and closed)
- [ ] Open / un-closed permits — must be resolved before closing
- [ ] Fire marshal inspection certificates [LA: State Fire Marshal]
- [ ] Health department permits (if food tenants) [LA: Dept of Health]
- [ ] Alcoholic Beverage Outlet (ABO) permits [LA: ATC]
- [ ] Sign permits
- [ ] Occupational licenses [LFT: Lafayette Consolidated Government]
- [ ] Sales tax registration [LA: state + parish/local separate registrations]
- [ ] Stormwater discharge permit (if applicable)
- [ ] Sprinkler / fire suppression certificates
- [ ] Elevator operating permits
- [ ] Generator air permits (if applicable)

## Phase 2 — Closing & Day-One Transition

These items execute at, on, or within 5 business days of closing. Coordinate among seller, buyer, title company, and incoming property manager.

### 2.1 Prorations & Closing Statement

- [ ] Rent prorations — current month, by tenant
- [ ] Prepaid rent transfer to buyer
- [ ] Real estate tax proration [LA: parish assessor cycle — verify]
- [ ] Insurance proration / cancellation refund
- [ ] CAM, tax, insurance reconciliations — final true-up at closing or 90 days post
- [ ] Utility prorations and final meter readings
- [ ] Vendor accruals — outstanding work / unbilled services
- [ ] Management fee / leasing commissions accrual
- [ ] Outstanding TI / LC obligations assumed by buyer
- [ ] Lender escrow balance transfer or refund
- [ ] Reserve account transfer

### 2.2 Security Deposits & Letters of Credit

- [ ] Security deposit reconciliation per tenant
- [ ] Cash deposit transfer to buyer's account (or credit at closing)
- [ ] LOC originals delivered to buyer
- [ ] LOC amendments / new LOCs in buyer's name (if required)
- [ ] Buyer assumes obligation to account / refund per lease terms
- [ ] Tenant notification of deposit transfer

### 2.3 Tenant Notification & Rent Direction

- [ ] Joint tenant notification letter (seller + buyer) — signed and mailed
- [ ] Rent direction letter — new payee, address, ACH info, payment portal
- [ ] New W-9 for buyer entity delivered to all tenants
- [ ] ACH change instructions for tenants on auto-pay
- [ ] New COI requirements / additional insured update letter
- [ ] Welcome packet to tenants from new owner / PM
- [ ] Property manager introduction (name, phone, email, emergency line)

### 2.4 Estoppels & SNDAs

- [ ] Estoppel certificate from each tenant — dated within 30 days of closing
- [ ] Discrepancies between estoppel and lease — resolved or carved out
- [ ] Anchor tenant estoppels — extra scrutiny on co-tenancy / continuous op
- [ ] REA party estoppels (if required)
- [ ] SNDAs from lender to tenants (if new financing)
- [ ] Subordination requirements re-confirmed

### 2.5 Insurance Transfer

- [ ] New owner insurance bound effective at closing — binder delivered
- [ ] Lender named as mortgagee / loss payee on new policy
- [ ] REA-required certificate holders added
- [ ] Tenant additional-insured status preserved or replaced
- [ ] Existing policy cancellation effective at closing
- [ ] Pending claims — clarified who controls (typically seller)
- [ ] Tail coverage / extended reporting period (if required)

### 2.6 Banking & Cash Management

- [ ] Operating bank account opened in buyer entity name
- [ ] Security deposit trust account opened (separate from operating) [LA: best practice]
- [ ] Reserve account opened (replacement reserves, TI/LC)
- [ ] Bank signatories filed (managing member, PM, controller as applicable)
- [ ] Wire and ACH instructions documented and distributed internally
- [ ] Lockbox / PO box established for rent receipts (if used)
- [ ] Online banking access provisioned to PM, bookkeeper, owner
- [ ] Positive pay / fraud controls enabled
- [ ] Tenant payment portal configured (DoorLoop, AppFolio, or equivalent)
- [ ] Credit card processing / merchant account established

### 2.7 Vendor Assignment & Notification

- [ ] Service contracts assigned (consents obtained where required)
- [ ] Vendors notified of ownership change in writing
- [ ] New billing addresses provided to each vendor
- [ ] New W-9 from buyer to vendors who owe 1099 reporting
- [ ] Replacement vendors selected where seller relationship not transferable
- [ ] Emergency vendor list distributed (24/7 plumbing, electrical, roof, glass, locksmith)

### 2.8 Keys, Access Codes, Locks

- [ ] Master key inventory — physical handover
- [ ] Sub-master / submaster keys per building / area
- [ ] Suite keys (where landlord retains spares per lease)
- [ ] Mechanical / electrical / roof / janitorial closet keys
- [ ] Alarm codes — main and per suite
- [ ] Gate / dumpster enclosure codes
- [ ] Management office locks rekeyed at closing
- [ ] Common area door / restroom keys
- [ ] Roof access keys / hatch codes
- [ ] Sign / monument access keys
- [ ] Key log with chain of custody
- [ ] Decision: rekey master after closing (recommended)

### 2.9 Utility Transfer

- [ ] Electric — common areas, parking lot lighting, signage [LFT: LUS or SLEMCO]
- [ ] Natural gas (if applicable)
- [ ] Water / sewer — landlord meters [LFT: Lafayette Utilities System]
- [ ] Trash service (if landlord-paid)
- [ ] Telecom / internet for management office
- [ ] Irrigation water (if separate meter)
- [ ] Final meter readings recorded
- [ ] Deposit refunds requested where applicable
- [ ] New accounts opened in buyer entity name
- [ ] Autopay configured

### 2.10 Mail, Address & Public-Facing Items

- [ ] USPS mail forwarding from prior owner address (if different)
- [ ] Property mailing address confirmed (suite for management office)
- [ ] Registered agent updated [LA: Sec of State filing]
- [ ] Property website / domain transferred or redirected
- [ ] Google Business Profile claimed / transferred
- [ ] Social media account access transferred or new accounts created
- [ ] On-site signage updated (management contact, leasing inquiries)

## Phase 3 — Property Management Handover

Operational continuity. Most failures here are documentation gaps, not bad faith. Insist on written SOPs and verified contact lists.

### 3.1 Tenant Directory & Contacts

- [ ] Full tenant contact list — primary, secondary, after-hours, emergency
- [ ] Tenant corporate / regional contacts (for national chains)
- [ ] Tenant accounting AP contacts (for rent / CAM billing)
- [ ] Tenant facilities contacts (for service requests)
- [ ] Tenant insurance broker / agent contacts
- [ ] Tenant legal counsel (where known)
- [ ] Co-tenancy / anchor tenant special escalation paths

### 3.2 Emergency Procedures

- [ ] 24/7 emergency contact line established
- [ ] Emergency response SOP (water leak, fire, electrical, gas, sewer backup)
- [ ] Hurricane / severe weather SOP [LA: critical — pre-season checklist]
- [ ] Tornado / wind event protocol
- [ ] Active shooter / security incident protocol
- [ ] Power outage protocol — sequence of restoration calls
- [ ] Tenant evacuation / shelter-in-place plans
- [ ] Emergency vendor list with after-hours numbers verified
- [ ] Local first responder contacts [LFT: LPD, LFD, LPSO, EMS]
- [ ] Property manager on-call rotation

### 3.3 Property Management Software

- [ ] Platform selected / continued (DoorLoop, AppFolio, Yardi, MRI, etc.)
- [ ] Subscription transferred or new account provisioned
- [ ] Historical data migration completed and verified
- [ ] Rent roll matches accounting system
- [ ] Tenant ledgers reconciled
- [ ] Vendor records imported
- [ ] Property profile, units, square footage configured
- [ ] Lease abstracts entered (all critical dates, options, escalations)
- [ ] Automated rent statements / invoices configured
- [ ] Late fee rules configured per lease
- [ ] Tenant portal access provisioned and welcome emails sent
- [ ] Owner portal access for ownership reporting
- [ ] User roles / permissions configured (PM, accounting, owner, leasing)

### 3.4 Maintenance Schedules

- [ ] HVAC PM schedule by unit (quarterly filter changes, semi-annual service)
- [ ] Roof inspection schedule (semi-annual, after major storms)
- [ ] Gutter / drain cleaning schedule
- [ ] Parking lot striping schedule (typically 2-3 years)
- [ ] Parking lot sealcoating schedule (typically 3-5 years)
- [ ] Parking lot light pole inspection and lamp replacement
- [ ] Pylon / monument sign light replacement schedule
- [ ] Fire sprinkler inspection (quarterly, annual, 5-year per NFPA 25)
- [ ] Fire alarm inspection (annual)
- [ ] Fire extinguisher service (annual, 6-year, 12-year hydrostatic)
- [ ] Backflow preventer test (annual per local water authority)
- [ ] Hood / grease trap cleaning (food tenants — verify tenant or landlord responsibility)
- [ ] Pest control treatment schedule
- [ ] Landscape mowing / mulch / seasonal schedule
- [ ] Pressure washing schedule (sidewalks, parking lot, dumpster areas)
- [ ] Window cleaning schedule (if applicable)

### 3.5 Leasing Pipeline & Marketing

- [ ] Active LOIs in progress — status and next steps
- [ ] Drafted leases pending execution
- [ ] Prospect pipeline log (CRM / spreadsheet)
- [ ] Broker relationships and current listing agreements
- [ ] Listing on LoopNet, CoStar, Crexi, etc. — transfer or relist
- [ ] Property marketing brochure / flyer (editable source files)
- [ ] Site plan / availability plan (editable)
- [ ] Photos (interior, exterior, drone) — high-res, transferable license
- [ ] Demographic / trade area study (current within 2 years)
- [ ] Co-tenancy / use restriction matrix for leasing reference
- [ ] Standard form lease (most recent version with attorney review date)

### 3.6 Operating Procedures & Policies

- [ ] Rent collection policy (grace period, late fees, NSF fees)
- [ ] Default / cure / eviction SOP [LA: civil law process via Justice of the Peace or City Court]
- [ ] Service request intake and dispatch SOP
- [ ] Vendor onboarding requirements (W-9, COI, MSA)
- [ ] Approval matrix (PM authority, owner approval thresholds)
- [ ] Capital expenditure approval workflow
- [ ] Lease execution authority and signing protocols
- [ ] Tenant relations / complaint resolution SOP
- [ ] Rules and Regulations document (typically attached to lease)
- [ ] Document retention policy

## Phase 4 — Bookkeeping & Accounting Handover

Where deals go to die. Push for full reconciliations through closing date and a single source of truth for the GL on transfer.

### 4.1 Chart of Accounts & GL

- [ ] Chart of accounts adopted (or migrated and mapped from seller)
- [ ] Property-level class / location / department coding
- [ ] Trial balance as of closing date — reviewed and accepted
- [ ] Opening balance sheet — buyer entity
- [ ] Closing balance sheet — seller entity
- [ ] GL system selected (QuickBooks Online, Sage Intacct, etc.)
- [ ] Integration with PM platform configured (rent roll → GL sync)

### 4.2 Accounts Receivable

- [ ] AR aging at closing — by tenant
- [ ] Disputed / contested charges identified and flagged
- [ ] Pre-closing AR retained by seller or sold/assigned to buyer (per PSA)
- [ ] Collection actions in progress and post-closing responsibility
- [ ] Write-off policy for uncollectible accounts
- [ ] Bad debt reserve methodology

### 4.3 Accounts Payable

- [ ] AP aging at closing — by vendor
- [ ] Unbilled work / accrued services identified
- [ ] Pre-closing AP retained by seller (typical) — list documented
- [ ] Stop-payment / wind-down on seller AP
- [ ] Mechanics liens / privileges potential — lien waivers from active contractors [LA: Private Works Act]
- [ ] Outstanding commission obligations to brokers

### 4.4 CAM Reconciliation Status

- [ ] Most recent prior-year CAM reconciliation completed and delivered to tenants
- [ ] Current year CAM estimates (monthly billing) reviewed
- [ ] Mid-year reconciliation for closing prorations
- [ ] Tenant CAM credits owed — list and amounts
- [ ] Tenant CAM billbacks owed — list and amounts
- [ ] CAM caps / stops tracking documented
- [ ] Methodology documentation transferred (gross-up, exclusions)

### 4.5 Tax Calendar & Filings

- [ ] Federal income tax filing deadlines and preparer identified
- [ ] Louisiana corporate / partnership tax deadlines [LA: LDR]
- [ ] Quarterly estimated tax payments scheduled
- [ ] Sales/use tax filing — landlord rare but required if any direct retail [LA: parish + state]
- [ ] Personal property / business tangible tax [LFT: Lafayette Parish Assessor LAT-5]
- [ ] Real estate tax payment cycle [LFT: Lafayette Parish Sheriff's Office / Assessor]
- [ ] Real estate tax appeal status / deadlines
- [ ] Annual report filing [LA: Sec of State, due each anniversary]
- [ ] Occupational license renewal [LFT: LCG, typically annual]
- [ ] 1099 filing process for vendors (Jan 31 deadline)

### 4.6 Reporting Cadence

- [ ] Monthly owner package contents defined (P&L, BS, rent roll, variance, AR aging)
- [ ] Quarterly reporting requirements (lender, investors)
- [ ] Annual budget process timeline
- [ ] Annual audit / review / compilation — preparer and timeline
- [ ] Lender-required reporting (covenant compliance, T-12, rent roll)
- [ ] Investor reporting if syndicated

### 4.7 Software Access

- [ ] Accounting platform — admin credentials
- [ ] Bank portal access for AP / treasury function
- [ ] Bill.com or equivalent AP platform
- [ ] Payroll platform if any employees
- [ ] Tax preparation software / portal
- [ ] Document management / secure file share

## Phase 5 — Legal File Handover

### 5.1 Counsel Relationships

- [ ] Outgoing counsel introduction call / file transfer letter
- [ ] Incoming counsel engagement letter executed
- [ ] Conflict check completed
- [ ] Confidential files transferred under joint engagement / waiver letter
- [ ] Active matter status memo from outgoing counsel

### 5.2 Active Legal Matters

- [ ] Eviction / collection actions — court, docket, status, next hearing
- [ ] Tenant disputes / arbitrations — status, position memos
- [ ] REA disputes — status and party positions
- [ ] Insurance claims under counsel
- [ ] Code enforcement matters
- [ ] Mechanics lien / privilege defenses [LA: Private Works Act timelines — confirm with counsel]

### 5.3 Legal Document Library

This is a list of templates to collect from counsel. A file name is not permission to send the notice. Which form is valid, and when, is counsel's call.

- [ ] Standard form lease (current attorney-approved version)
- [ ] LOI template
- [ ] Lease amendment template
- [ ] Estoppel template
- [ ] SNDA template
- [ ] Guaranty template
- [ ] Default notice templates counsel has approved for this state (the day-count is not in the file name)
- [ ] Vendor MSA template
- [ ] NDA template
- [ ] Demand letter templates

### 5.4 Corporate Governance Calendar

- [ ] Annual member / shareholder meeting
- [ ] Annual report filing date [LA: SOS]
- [ ] Registered agent renewal
- [ ] Operating agreement review cycle
- [ ] Board / member resolutions log

## Phase 6 — Physical Plant & Building Systems Inventory

One-time inventory at handover with photo documentation. Becomes baseline for future PCAs and insurance claims.

### 6.1 Site & Exterior

- [ ] Site plan / parking layout with stall count
- [ ] ADA parking stalls count and signage compliance
- [ ] Parking lot lighting inventory (poles, fixtures, controls, photocells)
- [ ] Bollards, wheel stops, curbing inventory and condition
- [ ] Landscape inventory (trees, beds, irrigation zones)
- [ ] Irrigation controller location and zone map
- [ ] Stormwater inlets / detention basin location and condition
- [ ] Dumpster enclosures (number, condition, capacity)
- [ ] Loading dock / service area inventory
- [ ] Exterior building photographs — all elevations
- [ ] Pylon sign — height, structure, electrical, tenant panels inventory
- [ ] Monument signs — same as above
- [ ] Directional / wayfinding signage inventory

### 6.2 Roof Systems

- [ ] Roof type per building (TPO, EPDM, modified bitumen, metal, etc.)
- [ ] Roof age and remaining warranty per building
- [ ] Roof warranty documents (NDL, manufacturer, contractor)
- [ ] Roof inspection reports (last 24 months)
- [ ] Penetration inventory (HVAC curbs, vents, drains, skylights)
- [ ] Roof access points and safety equipment
- [ ] Drainage system (internal drains, scuppers, downspouts)

### 6.3 HVAC / Mechanical

- [ ] RTU inventory per suite (manufacturer, model, serial, tonnage, age)
- [ ] Split system inventory (if applicable)
- [ ] Tenant vs landlord HVAC responsibility per lease — matrix
- [ ] Thermostat / BMS access
- [ ] Refrigerant type per unit (R-22 phase-out implications)
- [ ] PM service records last 24 months
- [ ] Make-up air / exhaust systems (food tenants)

### 6.4 Electrical

- [ ] Service entrance location and capacity per building
- [ ] Meter base inventory (utility meters per tenant + landlord)
- [ ] Main distribution panel locations
- [ ] Subpanel locations per tenant
- [ ] Site lighting panel(s) and controls
- [ ] Emergency / exit lighting inventory
- [ ] Generator (if any) — size, fuel, transfer switch
- [ ] Solar / on-site generation (none expected but verify)

### 6.5 Plumbing

- [ ] Water service entrance and meter inventory
- [ ] Backflow preventer inventory and test history
- [ ] Domestic hot water heaters (landlord vs tenant)
- [ ] Common area restroom fixtures and condition
- [ ] Grease trap / interceptor inventory (food tenants)
- [ ] Sewer cleanout locations
- [ ] Irrigation backflow / RPZ

### 6.6 Fire & Life Safety

- [ ] Sprinkler system type per building (wet, dry, pre-action)
- [ ] Fire pump (if applicable) — service records
- [ ] FDC (Fire Department Connection) inventory and access
- [ ] Fire alarm panel — make, model, age, monitoring company
- [ ] Pull stations, horn-strobes, smoke / heat detector inventory
- [ ] Fire extinguisher inventory (location, type, last service)
- [ ] Kitchen hood / Ansul systems (food tenants)
- [ ] Knox box location and key inventory [verify with LFD]
- [ ] Emergency exit signage inventory

### 6.7 Security / IT

- [ ] CCTV camera inventory and DVR/NVR access
- [ ] Access control / card reader inventory
- [ ] Alarm system zones and account info
- [ ] Common area Wi-Fi (if provided)
- [ ] Management office network / phones

## Phase 7 — Compliance & Regulatory (Louisiana / Lafayette Parish)

Louisiana is a civil law jurisdiction — terminology and procedure differ from common-law states. Verify everything with LA-licensed counsel.

### 7.1 State of Louisiana

- [ ] Secretary of State annual report — filing date and status
- [ ] Registered agent of record — verified
- [ ] LA Department of Revenue — entity tax registration
- [ ] Sales and use tax registration (if collecting any direct sales tax)
- [ ] Workers' compensation coverage [LA: required for any employees]
- [ ] Louisiana Workforce Commission registration (if employees)
- [ ] State Fire Marshal annual inspection records
- [ ] Louisiana Office of Alcohol and Tobacco Control — landlord disclosures for ABO tenants
- [ ] LA Real Estate Commission — broker / PM licensing if managing for others
- [ ] Notarial / authentic act recording verification for major property documents [LA civil law specifics]

### 7.2 Lafayette Parish / Lafayette Consolidated Government

- [ ] Occupational license — owner entity
- [ ] Occupational license verification — each tenant
- [ ] Lafayette Parish Assessor — real property records up to date
- [ ] Personal property declaration (LAT-5) filed
- [ ] Lafayette Parish Sheriff's Office — property tax payment status
- [ ] Lafayette Consolidated Government — building / zoning compliance
- [ ] Lafayette Utilities System (LUS) account status
- [ ] Lafayette Fire Department — pre-plan / Knox box on file
- [ ] Lafayette Police Department / LPSO — patrol coordination
- [ ] Lafayette Parish Health Unit — food establishment permits per tenant

### 7.3 Federal

- [ ] EIN current and entity classification confirmed
- [ ] FinCEN beneficial ownership (BOI): entities formed in the U.S. are exempt (interim final rule March 26, 2025; final rule effective Aug 14, 2026). Only foreign entities registered to do business in a U.S. state still report. Confirm the entity's status with counsel or the CPA.
- [ ] Form 1099 filings for prior year (vendor 1099-NEC, rent 1099-MISC for any landlord status)
- [ ] ADA Title III compliance documentation
- [ ] OSHA compliance (if any landlord employees on site)
- [ ] FEMA flood compliance and current flood insurance per lender

## Phase 8 — First 30 / 60 / 90 Day Action Items

### 8.1 Days 1–30

- [ ] Property walk with outgoing PM — full property tour, every suite exterior
- [ ] Introductory in-person meeting with each tenant (or call for absent operators)
- [ ] Confirm rent received from each tenant in new account
- [ ] Verify ACH / payment portal working for each auto-pay tenant
- [ ] Confirm utility transfers complete with no service interruption
- [ ] Validate insurance binder converted to full policy with all endorsements
- [ ] Validate lender escrow / reserve transfers reconciled
- [ ] Vendor confirmation calls — service continuing without disruption
- [ ] Emergency contact line tested
- [ ] After-hours response drill (water leak / lockout simulation)
- [ ] Photograph every suite exterior and common area for baseline
- [ ] Hurricane season readiness check [LA: June 1 – Nov 30]

### 8.2 Days 31–60

- [ ] First full monthly close in new GL — review with bookkeeper
- [ ] First monthly owner package delivered
- [ ] CAM billing reviewed for first month under new ownership
- [ ] Tenant satisfaction survey or check-in calls
- [ ] Service request volume and response time baseline established
- [ ] Vendor performance review — confirm or replace
- [ ] Active LOI / lease progression
- [ ] Marketing materials updated with new ownership / PM contact
- [ ] Website / listing platforms refreshed
- [ ] Roof and HVAC PM scheduled in calendar

### 8.3 Days 61–90

- [ ] CAM reconciliation methodology validated through closing-period reconciliation
- [ ] Post-closing prorations true-up with seller (typical 90-day deadline)
- [ ] Annual budget review and updates for new ownership assumptions
- [ ] Capital plan reviewed (roof, parking, HVAC replacement schedule)
- [ ] Lease abstracts spot-audited against source documents
- [ ] Tenant COIs audited — all current, additional insured correct
- [ ] Vendor COIs audited — all current
- [ ] Insurance review with broker — coverage gaps, claims trends, premium opportunities
- [ ] Property tax appeal consideration before deadline [LFT: Aug-Sep timeframe typical]
- [ ] First quarterly lender reporting (if applicable) delivered on time
- [ ] 90-day acknowledgment — sign-off page in this document

## Sign-off and acknowledgments

Phase completion sign-offs. Acknowledgment means the artifacts referenced in each section are in hand, reconciled, and accepted.

| Phase | Owner | Property manager | Date |
|---|---|---|---|
| Phase 1 — Due Diligence | | | |
| Phase 2 — Closing / Day-One | | | |
| Phase 3 — PM Handover | | | |
| Phase 4 — Accounting Handover | | | |
| Phase 5 — Legal Handover | | | |
| Phase 6 — Physical Plant | | | |
| Phase 7 — Compliance | | | |
| Phase 8 — 90-Day Confirmation | | | |

Counsel review acknowledgment: this checklist is a working framework, not legal advice. Final adequacy for any specific transaction must be reviewed by Louisiana-licensed counsel and a qualified CPA familiar with commercial real estate.

---

*Cypress Command builds practical AI-enabled operating systems for owner-led businesses — including the owners and operators of commercial real estate. This worksheet is educational. It is not legal, tax, or investment advice.*
