Maintenance Control Pack

Takeover, inspection, preventive calendar, work-order priorities, vendors, capex, and the daily walk.

PLATE · FIELD NOTE
Field note. Illustrative drawing.

Takeover, inspection, preventive calendar, work-order priorities, vendors, capex, and the daily walk. Work the list below. Progress saves in this browser. Download the printable blank.

A blank operating pack for one shopping center. It ties four things together: what is on the property, what you do before it fails, what you do when it fails, and how you explain the spend. Print it. Keep one copy at the desk and one with whoever walks the lot.

This is operator context. It is not an engineering opinion, a code opinion, or legal advice. The lease decides who repairs what. A statute or a permit decides what must be tested. When those conflict with habit, write down the conflict and ask the person whose job it is to answer it.

Fill the header once, then work the sections in order on a takeover and on the calendar after that.

FieldEntry
Center
Prepared by
Date
Management start date

1. When to open this pack

  • Takeover: sections 2 and 3 inside 30 days of appointment
  • Ordinary weeks: section 5 (calendar), section 6 (priorities), section 11 (walk)
  • Money: section 8 and section 9 at the quarterly owner review, and again at the annual plan
  • A loss or an after-hours failure: section 10 first, then the vendor list in section 7

2. Takeover protocol

Do these before you promise a tenant a repair you have not seen.

Thirty days before, or as soon as you have access

  • Prior work-order history exported, including anything still open
  • Vendor list with contract end dates and certificate end dates
  • Roof, HVAC, fire, and lot warranties located, not described from memory
  • As-built drawings compared with one walk. Note every mismatch
  • Keys, codes, and alarm accounts inventoried. Plan the change for day one
  • Open capital jobs named, with who pays and who is on site

Fourteen days before

  • After-hours roster confirmed: HVAC, electrical, plumbing, roof, board-up, glass
  • Utility account numbers and meter locations written down
  • Known leaks, trip hazards, and dark poles listed with a photo
  • Tenant contacts for facilities, not only for rent

Seven days before, and day one

  • Alarm and after-hours test placed on the calendar
  • Vendors told, in writing, who may approve work and who may not
  • First walk scheduled with the outgoing manager, every service yard included
  • Photo set of each elevation, the lot, and the roof access stored with the date

3. First 30 days — inspection

Walk with a camera. A line without a photo is a rumor.

SystemWhat you recordCondition (words, not a grade you invent)Photo dateOwner of the next step
Roof and drainsType, age if known, ponding, open penetrations
HVAC serving common areaUnits, filters, obvious failures
HVAC serving suitesWho owns each unit, per the lease
Parking lot and walksPavement, striping, lighting, trip points
Drainage and inletsStanding water, blocked inlets
Fire and life safetyPanel, extinguishers, exits, kitchen systems if any
Electrical roomsLabeling, clearance, obvious heat or odor
Plumbing and backflowLast test, if the tag is present
Waste and service yardsEnclosures, gates, grease equipment
SignsPylon, monument, dark faces
  • Every row has a name in the last column, or an explicit “none this month”

4. Critical systems inventory

One row per asset you would hate to discover during a failure. Add rows. Do not merge two roofs into one line to save space.

AssetLocationID / serial if on the nameplateYear or age if knownWarranty throughLease: landlord or tenantVendor

5. Preventive calendar

Put the work on a date. “Quarterly” is not a date.

MonthRoof / envelopeHVACLot, lights, landscapeLife safetyOther
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Gulf South centers usually pull storm prep forward of the wet season and keep exterior work in the mild months. A freeze market moves winterization earlier. Change the months. Keep the idea that the year has a shape.

  • Each filled cell names a vendor or an in-house owner
  • Statutory tests (alarm, sprinkler, backflow, hood) show the certificate, not only the visit

6. Work-order priorities

Use four words, the same way every week. Times below are a starting point to agree with ownership. Write the times you actually promise, then keep them.

PriorityExamplesAcknowledgeRestore or stabilizeWho can stop the clock
P1Water moving into a suite, fire-system impairment, a downed power line, a blocked exit
P2HVAC down in an occupied suite during business hours, a dark parking row at night
P3A routine repair that can wait for the next vendor day
P4Planned work already on section 5 or section 8
  • Every order has one owner. “The team” is not an owner
  • Closure includes a photo or a note of what “done” means
  • Anything open past your own limit has a written reason

7. Vendor control

  • W-9 and entity name match the contract
  • Certificate of insurance on file, landlord as additional insured where you require it
  • License checked where the trade requires one
  • Workers’ compensation on file where the law requires it
  • Scope, price, and who may approve extras are in a writing signed before work
  • Certificate end date is on a calendar 30 days ahead, and access stops when the certificate lapses
  • Major contracts (janitorial, landscape, HVAC service, sweeping) have a rebid or a written reason not to rebid on a cycle you chose
  • Invoices are compared with the contract rate before they are paid
VendorTradeContract endsCertificate endsAfter-hours phoneLast review

8. Capex plan

A repair keeps an existing thing working. A capital job replaces it or extends its life in a way the lease may not let you bill as CAM. Read the lease before you put a job in the recovery pool. When you are unsure, leave it out of the pool and ask.

JobSystemWhy this yearRough costRecoverable? (lease section)Year
  • A five-year list exists, even if years three through five are ranges
  • Reserves are a number someone can find, not a percentage mentioned once

9. Deferred maintenance log

If you are not doing it, write why, and what fails if you wait.

ItemSeen on (date)Risk if deferredCost to do itDecisionReview date

10. Emergency response

Fill the names before you need them. Test the list once a year.

RoleNamePhoneNotes
On-call operator
Owner contact
Insurance broker
HVAC after hours
Electrical after hours
Plumbing after hours
Roof after hours
Board-up / glass
Fire system
Alarm monitoring
  • Water, power, and gas shutoffs are located and labeled
  • Tenants have a written way to reach you after hours
  • After a P1, a short note of what happened and what changed is filed within seven days

11. Common-area walk

  • Storefront glass, walks, and the accessible route
  • Lot: litter, dumping, carts, striping, lights out
  • Service yards, enclosures, and gates
  • Pylon and monument faces, including faces that should be dark because the suite is dark
  • Standing water, and inlets that did not clear the last rain
  • Anything a customer would photograph. Write it down before they do
DateWalkerItems openedItems closed

12. Who repairs it

Do not argue from memory. One row per recurring fight, filled from the lease.

IssueLease saysIn practice latelyMatch?Next step
Roof and structure
Suite HVAC
Common-area HVAC
Storefront glass
Grease equipment
Interior plumbing
Lot and lights
  • A tenant work request is logged even when the lease makes it the tenant’s repair
  • After-hours work that closes an entrance is noticed ahead of time, with a named contact

13. Monthly note to ownership

Keep it shorter than the log. Attach the log.

LineThis month
P1 events
Orders open longer than your limit
Preventive work missed
Spend vs. the maintenance budget
Capital jobs moved, and why
Decision you need

14. Failures this pack is meant to catch

  • A vendor still on site after the certificate expired
  • A roof leak described in email and missing from the log
  • Capital billed as CAM because the invoice said “repair”
  • Two people authorized the same emergency, twice
  • The walk skipped the back lot because the front looked fine

15. Retail conditions worth a line of their own

  • Food tenants: hood, exhaust, and grease interceptor on a schedule, with the last service date
  • Sign criteria exist, and a new face is checked against them before it is built
  • Anchor or major-tenant facilities contact is a person you have met
  • Tenant build-out: penetrations, exhaust, and sprinklers are reviewed before work, and the drawing on file matches what was built
  • Shared access or drainage that crosses a property line is in the file, not only in someone’s head

Forms in this pack

BlankUse
Section 3 tableFirst-month inspection
Section 4 tableAsset register
Section 5 gridYear of preventive work
Section 6Priority rules you actually promise
Section 7 tableVendor and certificate dates
Section 8Capital list
Section 9What you are choosing not to do
Section 10Who answers the phone
Section 11The walk
Section 12Lease versus habit
Section 13The monthly note